https://www.gramoll.com/wp-content/uploads/2019/09/“.png

“The quality of the work by Gramoll and their subcontractors was outstanding and something Gramoll took great pride in.”

-Bill Nehmer, President, Great Dane of Utah, Inc.

 

CURRENTLY BIDDING

U of U ACC OR Expansion

Gramoll Construction has been selected by The University of Utah as the Construction Manager/General Contractor for the University of Utah ACC OR Expansion project, which is a Multi-phased project. This portion of the project in valued at approximately $3,500,000. Work hours are normal working hours, minus any noisy work such as saw cutting floors and jackhammering, or any shutdowns need to be coordinated with a PACE Plan with 4 weeks notice. There are patients that occupy floors 4-6 24/7 so all noisy work will need to be coordinated with the occupants. The 3rd floor has ongoing surgeries and there is an operating room in the hallway to the west. Material deliveries will need to be coordinated with the loading dock for times (hospital deliveries take precedent). Morning deliveries are strongly encouraged/required. There is a frieght elevator that offloads right by our job site that is 10′. Any other Materials that are larger than 10′ will need to be brought up the South Stairs. Parking will need to be offsite and workers will need to be shuttled in from the designated construction parking lots on campus (by Red Butte).


ALL AFTER HOURS AND WEEKEND WORK WILL BE INCLUDED IN YOUR BID. If you have questions about phasing please call Dustin. PLEASE PAY CLOSE ATTENTION TO PAGE G103. This is the phasing plan. This is called a 2 phase project, with 2 sub phases involoved in the 2 overall phases. The work involved for the locker room and the Breakdown and Dirty Intake room will have to be done at nights or over weekends. This is an active surgical coridor and cannot be shut down during the week. They are done with Surgeries roughly at 6PM, Monday – Friday. There are no surgeries on the weekend. The Locker Room will be done in the first phase, and the Breakdown and Dirty Intake will be in phase 2. Please reference the overall schedule as well for feedback on the phased schedule.


Once phase 1 is complete (Break Room, Conference Room, Temp trash/anesthesia room, Locker Room) they will be moving in for about 2 weeks. We need to move the existing folding partition from the current break room down the hall to this new break room in this phase. Once they move out, we start the demo of phase 2 (everything minus the temp trash/anesthesia) we need to get the permanent rooms (trash, anesthesia, specimen, materials management, physicians touchdown) completed so that they can then move out of the temp trash and anesthesia room. We then will finish those spaces to the shared office, anesthesia office and supply room, while finishing the 2 OR rooms.


The roof Drains on level 2 have already been ran in the ceiling space, but the floor needs to be cored and the pipes need to be connected as part of this bid, but you don’t need to bid the roughly 60′ of primary and secondary roof drain piping already in the 2nd floor ceiling space.


As a reminder, Masks are still a requirement at the hospital. Please make sure all employees will be wearing masks during the entirety of the project. All personel on the jobsite will also be required to be badged and go through the HIPA training before starting onsite.


Gramoll is requesting proposals on Demolition, Misc Steel, Millwork, Doors and Frames, Ceiling Tile, Ceramic Tile, Flooring, Wall and Door Protection, Folding Partition Salvage/Move, Overhead Coiling Door, Corner Guards, Fire Sprinklers, Drywall, Joint Sealants, Mechanical, Plumbing and Electrical. Proposals are due to Gramoll Construction by Tuesday October 11th at 12:00 PM.


Onsite walks will be coordinated with Gramoll Construction if needed. Please give a couple days notice so we can coordinate with occupants.


SCHEDULE
Last Day to Submit Questions by – 10/4/22 @ 2:00 PM
Final Addendum Posted by (If Needed) – 10/7/22 @ 2:00 PM
Subcontractor & Supplier bids due by – 10/11/22 @ 12:00 PM
Project Start Date – 10/31/22
Project Substantial Completion Date – 12/2023

Owner

The University of Utah

Architect

FFKR Architects

Bids Due

Tuesday, October 11, 2022

TALK TO US ABOUT THIS PROJECT

Do you have a question to ask us? We have answers that can help.





    Gramoll Construction Contact

    Dustin Gramoll
    155 South 750 West, North Salt Lake, Utah 84054
    Phone (801) 295-2341
    Fax (801) 295-2356

    Bid Documents

    Drawings
    Specifications
    Schedule

    Addenda

    Check back for addenda.

    Rio Grande Depot Structural Upgrade

    Coming soon.

    Owner

    DFCM

    Architect

    CRSA

    Bids Due

    TBD

    TALK TO US ABOUT THIS PROJECT

    Do you have a question to ask us? We have answers that can help.





      Gramoll Construction Contact

      Sean Gramoll
      155 South 750 West, North Salt Lake, Utah 84054
      Phone (801) 295-2341
      Cell (801) 403-4342
      Fax (801) 295-2356

      Bid Documents

      Will be available at a later date.

      Addenda

      Please check back later.

      Have a project of your own? Let’s touch base.