$6,100,000
Project Budget

EDA
Project Architect

4,400 SF
Project Size

CM/GC
Procurement

March 2022 To September 2023
Duration

The University of Utah
Owner
OVERVIEW
This 9,200 SF project consisted of the renovation and expansion of the prestigious Nora Eccles Harrison Cardiovascular Research and Training Institute (CVRTI) at the University of Utah. A laboratory known for its groundbreaking cardiovascular research.
The expansion included the construction of a steel and concrete structure basement plus two-story addition. It features a brick facade that compliments the historical ambiance of the Fort Douglas area on campus. The expansion facilitates a spacious 26-freezer farm and increased laboratory and administrative space.
Throughout the existing building, the HVAC system was upgraded to a Variable Refrigerant Flow (VRF) system, allowing for separate climate control in each room.
Given the historical significance of the Fort Douglas area on campus, remnants of past structures were uncovered during excavation for the addition. The Gramoll team collaborated with archaeologists at the University of Utah to ensure the findings were properly documented and preserved before resuming construction.
SIMILAR PROJECTS

EVR ASPIRE, Utah State University

Sensapure Tenant Improvement

The Nora Eccles Harrison CVRTI, University of Utah

HPER East Build Out Remodel

New Welding Center, Uintah Basin Technical College

Tooele Science and Technology Building, Utah State University

TerraTek Lab Expansion & Building Remodel

USTAR BioInnovations Center Utah State University

Bingham Entrepreneurship and Energy Research Center, Utah State University

DATC Barlow Technology Building

Fredrick Sutton Geology University of Utah

Sant Engineering Innovation, Utah State University