$2,235,000
Project Budget

Brixen & Christopher Architects
Project Architect

30,000 SF
Project Size

CM/GC
Procurement

April 2010 To February 2011
Duration

TerraTek
Owner
OVERVIEW
The TerraTek lab expansion and building remodel project in Salt Lake City involved a build-out and renovation of an existing tilt-up concrete building. The project added a steel structure, including a second floor for a total build-out area of 21,100 SF. To improve functionality and aesthetics, 9,000 SF of existing space was remodeled.
The new build-out included conference rooms, offices, open office spaces, restrooms, and a 4,400 SF high-bay manufacturing area equipped with a 5-ton crane. It also featured advanced laboratory space with four fume hoods to support TerraTek’s specialized operations. The remodeled areas included a new front lobby providing a secure entrance, a “Town Hall” meeting space, additional offices, laboratory space, a café, and additional restrooms.
The existing building remained occupied throughout the construction process. The Gramoll team carefully scheduled and phased construction to minimize disruption to TerraTek’s ongoing operations.
SIMILAR PROJECTS

EVR ASPIRE, Utah State University

Sensapure Tenant Improvement

The Nora Eccles Harrison CVRTI, University of Utah

HPER East Build Out Remodel

New Welding Center, Uintah Basin Technical College

Tooele Science and Technology Building, Utah State University

TerraTek Lab Expansion & Building Remodel

USTAR BioInnovations Center Utah State University

Bingham Entrepreneurship and Energy Research Center, Utah State University

DATC Barlow Technology Building

Fredrick Sutton Geology University of Utah

Sant Engineering Innovation, Utah State University