Not Disclosed
Project Budget
![](https://www.gramoll.com/wp-content/uploads/2019/09/Group-142.png)
Samual J. Brady
Project Architect
![](https://www.gramoll.com/wp-content/uploads/2019/09/Component-9-–-10.png)
13,000 SF
Project Size
![](https://www.gramoll.com/wp-content/uploads/2019/08/Group-35.png)
Design Build
Procurement
![](https://www.gramoll.com/wp-content/uploads/2019/09/Group-141-2.png)
July 2023 To January 2024
Duration
![](https://www.gramoll.com/wp-content/uploads/2019/08/Group-27.png)
Great Dane Trailers
Owner
OVERVIEW
The Great Dane Trailers shop expansion project involved adding 13,000 square feet of space to accommodate the growing needs of the service and repair department. A key challenge was stabilizing the soil in a high water table area, as the site was a former vehicle garbage dump.
The expanded shop features an overhead bridge crane with concrete floor tie-down anchor points. The Gramoll team meticulously managed the shop addition to ensure the project was completed without any interruptions to the existing facilities’ continuous operations. This project demonstrates Gramoll Construction’s ability to manage complex expansion projects while facilities are actively in use.
SIMILAR PROJECTS
![](https://www.gramoll.com/wp-content/uploads/2024/12/JSP-00.png)
Jordanelle State Park Dock Replacement
![](https://www.gramoll.com/wp-content/uploads/2025/01/EVR-00.png)
EVR ASPIRE, Utah State University
![](https://www.gramoll.com/wp-content/uploads/2024/05/Great-Dane-Trailers-Add.png)
Great Dane Trailers Expansion
![](https://www.gramoll.com/wp-content/uploads/2024/03/ACC-OR-1.png)
ACC Operating Room Expansion, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2024/03/CVRTI.png)
The Nora Eccles Harrison CVRTI, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2024/12/DUMKE-00.png)
Dumke Gymnastics Center Remodel and Addition
![](https://www.gramoll.com/wp-content/uploads/2024/10/HPERE-00.png)
HPER East Build Out Remodel
![](https://www.gramoll.com/wp-content/uploads/2024/03/ACC-PS-1.png)
ACC Procedure Suite Remodel , University of Utah
![](https://www.gramoll.com/wp-content/uploads/2024/03/HMHI-1.png)
Huntsman Mental Health Institute, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2024/05/Bldg73-0.png)
Building 73, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2021/02/Guest_House_ext_01_red.jpg)
Guest House Expansion, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2020/12/NEHMA_int_01_red.jpg)
Nora Eccles Harrison Museum of Art Addition, Utah State University
![](https://www.gramoll.com/wp-content/uploads/2024/05/Burbidgea.png)
Burbidge Expansion, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2021/11/USU_SLC_Int_01_R.jpg)
Salt Lake Campus Relocation, Utah State University
![](https://www.gramoll.com/wp-content/uploads/2024/05/Moran.png)
Moran Eye Center, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2020/12/USUFineArts_int_01_red.jpg)
Fine Arts Complex Addition/ Renovation, Utah State University
![](https://www.gramoll.com/wp-content/uploads/2024/05/EAE.png)
Entertainment Arts & Engineering, University of Utah
![](https://www.gramoll.com/wp-content/uploads/2024/10/RESR-00.png)
U of U Stadium Restrooms Addition & Remodel
![](https://www.gramoll.com/wp-content/uploads/2024/06/Huntsman.png)
Hunstman Arena Renovation
![](https://www.gramoll.com/wp-content/uploads/2019/09/Rustler_Lodge_Exterior_1_Red.jpg)
Rustler Lodge Addition & Renovation
![](https://www.gramoll.com/wp-content/uploads/2024/06/Terratek.png)
TerraTek Lab Expansion & Building Remodel
![](https://www.gramoll.com/wp-content/uploads/2019/11/Lampros_Hall_Exterior1_Red.jpg)
Lampros Hall, Weber State University
![](https://www.gramoll.com/wp-content/uploads/2019/09/Cowles-Building-Ext_01-Red.jpg)